PetWale
Long Lead - Nylon
Couldn't load pickup availability
A 14 feet long leash used by trainers to work on recall, search, fetch and for many other behavioural and professional training for your doggos.
This leash is available in 2 variants of thickness - 1" & 1.5" in width making it comfortable to hold and strong enough to train pups and large sized dogs alike.
Materials
Materials
Soft Nylon Webbing with Rust-resistent Metallic Fittings
Shipping & Returns
Shipping & Returns
Items will be dispatched within 48 hours of order being placed. And delivery timelines are between 2-7 days of order placement.
If you wish to return/exchange the product please send us an e-mail to hello@petwale.com with the order number, return/exchange reason and details.
Dimensions
Dimensions
All leashes are 5 feet in length.
The Small Size Leash is 0.75" in width.
The Medium Size Leash is 1" in width.
The Large Size Leash is 1.5" in width.
Care Instructions
Care Instructions
Hand wash is preferred.
Pro tip: Soak in baking soda and vinegar for a 2 hours before washing to remove the tough stains and smells from the products.





-
Free Shipping
Shipping on all pre-paid orders above is FREE*
-
Hassle-Free Exchanges
All you need to do is send us an e-mail with your order number and exchange details to hello@petwale.com
-
Same Day Dispatch
All orders will be dispatched within 24 hours.